Quantitative Aptitude Quiz For SBI PO/Clerk Prelims
Numerical Ability or Quantitative Aptitude Section has given heebie-jeebies to the aspirants when they appear for a banking examination. As the level of every other section is only getting complex and convoluted, there is no doubt that this section, too, makes your blood run cold. The questions asked in this section are calculative and very time-consuming. But once dealt with proper strategy, speed, and accuracy, this section can get you the maximum marks in the examination. Following is the Quantitative Aptitude quiz to help you practice with the best of latest pattern questions.
Directions (1-3): Each of the questions given below consists of a statement and/or a question and two statements numbered I and II given below it. You have to decide whether the data provided in the statement(s) is/are sufficient to answer the given question. Read both the statements and Give answer
Q1. What marks have been obtained by Arun?
I. Arun’s marks are the average of marks of Nitin and Manick.
II. Nitin obtained 80 marks and this is 25% more than the marks obtained by Manick.
Q2. Which of the four numbers w, x, y and z is the largest ?
I. The average of w, x, y and z is 25.
II. The numbers w, x and y are each less than 24.
w + x + y + z = 4 × 25 = 100
From II,
x, y, w < 24
And if average of all of 4 numbers is 25 then z must be greater than 25
So, by combining both statements, we can find that z is the largest no.
Q3. What is the average weight of the three new members who are recently included into the team?
I. The average weight of the team increases by 20 kg.
II. The three new men substitute earlier members whose weights are 64 kg, 75 kg and 66 kg.
Combining statements I and II,
nx – 64 – 75 – 66 + a + b + c = (x + 20) × n where a, b and c are the weights of three new members
⇒ (a + b + c) = 20n + 205
Here, we don’t know value of n.
So, answer can’t be found.
Q4. A train crosses a man, who is running in the same direction of train at the speed of 2m/sec. in 10 seconds. The same train crosses a tunnel in 54 seconds. If speed of train is 72 km/h then what is the length of tunnel?
Q5. Raghav can beat Suresh by 100m in a race of 1 km when they run at speed of 10m/sec and 8 m/sec respectively. If Suresh increases his speed by 7m/sec then by how much time he will beat Raghav in the same race of 1km?
Q6. The total time taken by a boatman to row his boat upstream and downstream together, a distance of 56 km is 12 hours. The difference between times taken by him to row his boat upstream and downstream, distance of 42 km is 3 hours. Find the speed of boat and stream.
Q7. If a train runs at 40 kmph, it reaches its destination late by 11 minutes. But if it runs at 50 kmph, it is late by 5 minutes only. The actual time (in minutes) for the train to complete the journey:
Directions (8-10): Each question is followed by three statements. You have to study the question and all the three statements given and decide whether any information provided in the statement(s) is redundant and can be dispensed with while answering the questions.
Q8. What is the rate of interest?
A. The compound interest on a certain sum is Rs 19.20 more than the simple interest on the same sum and rate of interest at the end of the second year.
B. The simple interest at the same sum and same rate of interest at the end of 5 years is Rs 2400.
C. The difference between compound interest and simple interest on Rs 12,000 for 3 years is Rs 58.368.
Q9. Sameer works for 8 days and leaves the job and the remaining 75% work is done by Mahesh and Kumar together in 15 days. In how many days can all three together do the work?
A. Kumar alone can do three-fourths of the work in 75 days.
B. Sameer alone can do the work in 32 days.
C. Mahesh and Kumar together can do the work in 20 days.
Q10. What will be the cost of painting the four walls of a room if the rate of painting is Rs 25 per square metre?
A. Perimeter of the floor is 44 m.
B. Height of the wall of the room is 10 m.
C. Ratio of length and breadth of the room is 3 : 1.
Area of four walls of the room = 2 (l + b) × h = 44 × 10 = 440 m²
So, required cost = 440 × 25 = Rs 11000
Hence, statement C can be dispensed with.
Directions (11-15): What approximate value should come in place of question mark (?) in the following questions?
Q11. 12.95 × 7.05 + (85.01)² × 10.99 = ?
≃ 79566
Q12. 432.92 - 269.11 ÷ (11.9% of 74.95) = ?
Q13. 899.99÷45.072= ?-224.088
Q14. (17.95)² - (14.05)² + (2343.95 + 80.93) ÷ ? = 229
Q15. 39.97% of (649.8 ÷ 13.05) = 45.12 - ?